Thank you for your patience while we retrieve your images.
Uploaded 26-Sep-22
Taken 25-Sep-22
Visitors 2


8 of 19 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3300 x 2200
Original file size1.59 MB
Image typeJPEG
Color spacesRGB
Date taken25-Sep-22 21:16
Date modified26-Sep-22 16:41
Shooting Conditions

Camera makeCanon
Camera modelCanon EOS 7D
Focal length50 mm
Exposure1/8000 at f/1
FlashNot fired, compulsory mode
Exposure bias-1 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 1250
Metering modePattern
nwdp0926.Weaver_Road_worker

nwdp0926.Weaver_Road_worker

Donna Price / American Press
Jimmy James Edward picked the coolest spot around to build box for a drainage pipe installation project on Weaver Road Monday. As temperatures climbed into the 90s, the McManus Construction worker knelt in the shade of a company pickup truck to build the box. The drainage work is being done so a sidewalk can be constructed on Weaver Road. The road is currently down to one lane from from W. McNeese Street to Country Club Road.